Please ensure Javascript is enabled for purposes of website accessibility Traffic: Goldstream Avenue between Veteran’s Memorial Parkway and Bryn Maur - City of Langford
CITY HALL OPERATIONAL UPDATE
CITY HALL OPERATIONAL UPDATE:

Langford City Hall has reopened and resumed full services as of 8:30 a.m. Monday, July 8th.

Most departments of City Hall were left temporarily inaccessible following the flood event on June 26th, 2024. While restoration work continues, operations are back to full capacity, functioning out of two floors of 877 Goldstream Avenue.

Administration, Bylaw, Parks, and Engineering Departments will be available on the second floor of City Hall.

Finance, Planning, Building, and Business Licensing Departments will be available at the ground floor unit #117 of 877 Goldstream Avenue. This unit is accessible from the left side of the building, directly off the rear parking lot.

Committee and Council meetings remain uninterrupted and will be held as scheduled on the third Floor of City Hall in Council Chambers.

Signs are in place to direct residents seeking assistance from specific departments. Alternatively, support continues to be available through email and phone 250-478-7882.

 

Read All Advisories

Traffic: Goldstream Avenue between Veteran’s Memorial Parkway and Bryn Maur

TRAFFIC ADVISORY

Issued:       Friday, March 10, 2023

Where:       Goldstream Avenue between Veteran’s Memorial Parkway and Bryn Maur

When:        Monday, March 13, 2023 to Friday, March 17, 2023, 7:00AM to 5:00PM

What:         Lane Closure – Watermain Replacement

Please be advised that from Monday, March 13, 2023, to Friday, March 17, 2023, Watermain construction will be taking place on Goldstream Avenue between Veterans Memorial Parkway and Bryn Maur. Business and bus access will be maintained in both directions. The map below illustrates the work zone and a detour available while this work occurs.

If accessing the Goldstream Station Plaza, please try to use the secondary access off Bryn Maur. Delays are to be expected. Construction Crews will be working on-site between 7:00AM and 5:00PM. The city will also work with all businesses to advertise on their behalf that business is still open.

BC Transit and emergency vehicles will have full access through this work location.

This project is part of a much larger watermain replacement that continues west as far as Leigh Road. The project is being constructed in sections to best manage traffic. The project has started at the east end/Veterans Memorial Parkway to get out of the downtown area before the warmer weather and special events occur. An updated traffic advisory will be issued weekly or more frequently, if required. Please visit www.langford.ca where a link will occur.

Traffic control personnel will be on-site during working hours to facilitate vehicle and pedestrian access to local businesses in the affected area. Please follow the RED route during construction if accessing businesses. Parking is available off Claud Road for people who prefer to walk to their destinations. Please follow signage and Traffic Control Personnel directions during construction. Motorists should expect and should plan for longer commuting times. We apologize for the inconvenience.

sidebar hashtag menu home office pencil images camera headphones music video-camera bullhorn connection mic book books file-empty files-empty folder folder-open price-tag barcode qrcode cart coin-dollar coin-euro mobile user users user-plus user-minus key lock unlocked glass mug spoon-knife fire bin switch cloud-download cloud-upload bookmark star-empty star-half star-full play pause stop backward forward first last previous next eject volume-high volume-medium volume-low volume-mute amazon google whatsapp twitter dribbble behance behance-black github appleinc finder windows8 skype pinterest pinterest-o chrome firefox edge safari opera file-pdf file-word file-excel html-five asterisk search search-plus search-minus cog arrow-circle-o-down arrow-circle-o-up edit share-square-o check-square-o arrows question-circle arrow-left arrow-right arrow-up arrow-down mail-forward expand compress eye eye-slash comment twitter-square facebook-square camera-retro cogs comments thumbs-o-up thumbs-o-down sign-out linkedin-square external-link sign-in unlock feed bell-o arrow-circle-left arrow-circle-right arrow-circle-up arrow-circle-down globe filter arrows-alt link paperclip bars envelope linkedin rotate-left bell angle-left angle-right angle-up angle-down desktop mail-reply mail-reply-all chain-broken chevron-circle-left chevron-circle-right chevron-circle-up chevron-circle-down html5 unlock-alt youtube-square youtube-play dropbox stack-overflow apple windows trello female male arrow-circle-o-right arrow-circle-o-left wordpress file-image-o paper-plane paper-plane-o share-alt cc-visa cc-paypal cc-stripe bell-slash bell-slash-o facebook-official trademark registered wikipedia-w question-circle-o
Your browser is out-of-date!

Update your browser to view this website correctly. Update my browser now

×