Traffic: Goldstream Avenue between Veteran’s Memorial Parkway and Bryn Maur
TRAFFIC ADVISORY
Issued: Friday, March 10, 2023
Where: Goldstream Avenue between Veteran’s Memorial Parkway and Bryn Maur
When: Monday, March 13, 2023 to Friday, March 17, 2023, 7:00AM to 5:00PM
What: Lane Closure – Watermain Replacement
Please be advised that from Monday, March 13, 2023, to Friday, March 17, 2023, Watermain construction will be taking place on Goldstream Avenue between Veterans Memorial Parkway and Bryn Maur. Business and bus access will be maintained in both directions. The map below illustrates the work zone and a detour available while this work occurs.
If accessing the Goldstream Station Plaza, please try to use the secondary access off Bryn Maur. Delays are to be expected. Construction Crews will be working on-site between 7:00AM and 5:00PM. The city will also work with all businesses to advertise on their behalf that business is still open.
BC Transit and emergency vehicles will have full access through this work location.
This project is part of a much larger watermain replacement that continues west as far as Leigh Road. The project is being constructed in sections to best manage traffic. The project has started at the east end/Veterans Memorial Parkway to get out of the downtown area before the warmer weather and special events occur. An updated traffic advisory will be issued weekly or more frequently, if required. Please visit www.langford.ca where a link will occur.
Traffic control personnel will be on-site during working hours to facilitate vehicle and pedestrian access to local businesses in the affected area. Please follow the RED route during construction if accessing businesses. Parking is available off Claud Road for people who prefer to walk to their destinations. Please follow signage and Traffic Control Personnel directions during construction. Motorists should expect and should plan for longer commuting times. We apologize for the inconvenience.